Overview Package size per unit product 100.00cm * 100.00cm * 100.00cm Gross weight per unit product 5000.000kg Product P
Basic Info
Model NO. 02
Application Machinery Parts
Machining Machining Center
Material Steel
Surface Treatment Sand Blast
Surface Roughness Ra6.3
Standard ASTM
Certification ISO 9001:2008
Heat Treatment Normalizing+Tempering+Quenching
Delivery Status Pre-Machined or Finished Machining
Surface Hardening 400-450hb
Weight 3 to 190 Tons
Certificate ABS,CCS,BV,Lr,Dnv,Rina,Kr,Nk
Wall Thickness Min. 50mm
Test Block 230*70*50mm
Packing Wooden Case
Transport Package Wooden Case
Specification 12m*9m*6m
Trademark OEM
Origin China
HS Code 8414909090
Production Capacity 6, 000 Metric Tons/Month
Packaging & Delivery
Package size per unit product 100.00cm * 100.00cm * 100.00cm Gross weight per unit product 5000.000kg
Product Description
Product Parameters

The material is low carbon or alloy steel,such as ZG270-500,ZG42CrMo,ZG35Mn and so on.

Material:ZG25CrNiMo

Steel GradeChemical Composition %
CSiMnCrNiMoSP
ZG25CrNiMo0.25-0.300.20-0.400.70-0.900.40-0.700.40-0.700.15-0.25<=0.025<=0.025
ZG30CrMo0.26-0.330.17-0.370.40-0.700.80-1.10-0.15-0.25<=0.025<=0.025
ZG35CrMo0.32-0.400.17-0.370.40-0.700.80-1.10-0.15-0.25<=0.025<=0.025
Standard

Yield Strength

Rp0.2 /MPa

Tensile Strength

Rb / MPa

Elogation

A / %

Reduction of Area

Z/ %

60K≥414≥586≥18≥35
75K≥517≥655≥18≥35
80K585-660≥725≥18≥35
MaterialCSiMnPS
ZG270-5000.32-0.400.20-0.520.45-0.90≤0.035≤0.035
MaterialCSiMnPSCrMo
ZG42CrMo0.38-0.430.15-0.350.75-1.00≤0.035≤0.0350.80-1.100.15-0.25
MaterialCSiMnPS
ZG35Mn0.30-0.400.60-0.801.10-1.40≤0.035≤0.035

It is up to customers' requirement.
ItemStandard
Casting MaterialEN 10293/EN 10025/BS 3100/DIN 1681/DIN17205
Casting Tolerance in BlankISO 8062 CT 13
Size ToleranceDIN ISO 2768m
NDTASTM A609 Level 2 or 3 /EN 12680/ASTM E94 Level 2 or 3
Heat TreatmentNormalizing+Tempering+Quenching
HardnessAs Required
Company Profile

Haian Haitai Casting. is established in 2003 in Huangqiao Town.

In 2007,we moved our factory to Sunzhuang town and now we can supply bigger steel castings with max. weight 45 tons.

In 2011,we built a new sand mold maiking workshop with 120 tons refinining furnace and the max. weight can be 120 tons.

In 2013,we paid more attenion on the castings for shipbuilding and started to supply marine castings for most of domestic famous shipyards.

From 2013 to 2022,we bought more and more machines to strengthen our ability from rough machining to finished machining.

In 2021,we built another new sand mold making workshop for the quick development of market requirement.

Now we monthly supply 6000 tons different castings for different customers of different industry,such as cement mill,shipubuilding,petroleum machinery,rolling mill,forging press and so on.

Prodcution Process

1)Pattern making

We have our own wooden pattern making workshop.But our company is always busy,
we also have around 10 sub-contractors for pattern making.
They help us for the pattern but will be inspected according to our rules.
We will record for every pattern inspection.

2)Silica or chorme sand cores
We have around 80 technicans for sand core making which is divided into around 10 teams.
Most of the technicans has more than 10 years' experience.
Most of the sand core is made by silica sand with common sand inside of it.
The common sand will be used repeatly.
For some important position,such as R corner,we will use chorme ore sand.
The outside of the sand core,we will do the painting,burn and clean it.
We will assemble diffrent sand cores together and wait for pouring.

3)Melting and Pouring

We always do the melting after mid-night for cheaper electric charge.
And we normally do pouring in the early morning.

No.Equipment NameQuantity(Set)
125 tons Electrical Arc Furnace1
250 tons Intermediate Frequency Furnace2
3120 tons Refining Furnace1
4120 tons VD Furnace2
Before and after pouring,we will do the chemical compostion test.4)Cooling

After pouring,we will wait for different time for cooling according to casting's weight.

ItemWeight in blank(Metric Tons)Cooling Time(Hour)
1<2548
2>25-4072
3>40-5596
4>55-72120
5>72-96144
6>96-115168
7>115192

We have our experience and rules for cooling time.
After cooling,we will shake the casting out of the steel boxes and clean them.
5)Heat Treatment
Normalizing will be 3 days while tempering is 4 days.
We have around 10 sets of heat treatment furnaces.
The biggest one is 12m*9m*6m.
It is also the biggest size of castings we can make.
After heat treatment,we will do the mechanical property test.
Our ordinary test block's size is 230mm*70mm*50mm.
One casting part will min. have 3 pcs test blocks.
We have our testing center and it is approved by CNAS.
6)Draw the line and do the first rough machining
We can do the machining from rough to finished machining.

 

7)NDT after rough machining

 

8)Welding repair
We have rich experience for making support rollers and kiln tyres,
then there is no welding for the outside working position.
This is our special technology.
Every year we supply around 400pcs kiln tyres,930pcs support roller,170 sets gear( in two halves).
But for some other castings,if we do the welding repair,
we will do the tempering for stress relief later.
All of our welders have the SGS certficate.
9)Shot blasting and grindingWe have a robert grinder.We have a 120 tons rotary shot blasting table.
10)Final machining
We have a lot of vertical lathes from 2.5m to 10m. Certifications

We get approval from CNAS for our laboratory.
We also have 9 class certificate,such as ABS,DNV,NK,RINA,KR,CCS,BV and so on.

Packaging & Shipping

We supply a lot of castings for cement mill,rolling mill,shipbuilding and so on.

We can do the packing according to our rules or according to customers' requirement.

After Sales Service

Normally there is a 12 months quality warantty.

We do at least three times NDT:after rough,semi-finished and finished machining.

And also the customer will do the witness during or after finished machining.

If there is also any problem when you receive the castings,
please send us photos and detailed defects,
we will negotiate with you and make a compensation.

A third party inspection before shipment is welcomed.